|
Build Your Online Product Catalogs?
Product Name: |
Structural strengthening Non-shrink Grouting material
|
Supply Ability: |
2000000 mts |
Related proudcts |
grouting material, cement grout, |
Specifications |
25kg package |
Price Term: |
FOB,CNF,CIF |
Port of loading: |
TIANJIN PORT |
Minimum Order |
20TON |
Unit Price: |
1000-2500 |
|
Cement Based Non-shrink Grouting Material is blended through a special procedure by specially selected cementitious material, carefully selected fine aggregate and admixture. It owns the characteristics of high flow, non-shrinkage, early strength and high strength. Functionally they are divided into two categories include four products: High strength -¢ñ,-¢ò; Extra early strength-¢ñ, -¢ò. Properties: 1. Double expansion in plastic and hardened state, compensate the dry shrinkage, ensure the fixed combination between steel-back plane and concrete base, efficiently transmit the load carrying into the base. 2. High early strength: this material is obtained by special cement as its basic material, it is suitable for urgent repair and accelerators construction under negative temperature environment. 3. High fluidity. 4. Easily used, only mixed with water on site, easily pumped. 5. Durability: High final strength, excellent impermeability and corrosion resistance, ensure accuracy of equipment setting. 6. Working environment: this material can be operated in a negative temperature environment with a rapidly increased strength. 7. Non-chloride: no harm for equipment or armature reinforcement Technical Data (test in standard lab) Name HS-¢ñ HS-¢ò EES-¢ñ EES -¢ò Grain size 4.75mm/% £¼2.0 Setting time(min) Initial ¡Ý120 ¡Ý45 Bleeding capacity/% £¼1.0 Fluidity /mm Initial ¡Ý260 30min ¡Ý230 Compressive (***)£¬¡Ý 4h - - 30 - 12h - - - 10 1d 35 22 50 45 3d 55 40 55 55 28d 80 70 70 70 Height change % 1d Bond strength (***) 28d ¡Ý4.0 Erosion to armature none W/C 0.15 0.16 0.12 0.15 Operating temperature ¡Ý5℃ ¡Ý-5℃ Usage: 1. Heavy equipment, High precision grinder. 2. Erection Engineering of Structural steel. 3. Grouting to column foundation, pile foundation and Rock foundation to fixation. 4. Anchoring of frame structure joint. 5. Repair to the honey-comb and holes of reinforced concrete structure. 6. Repair & Reinforcement to concrete structure. Using methods: Foundation |
Company: |
Tangshan polar bear building materials co.,ltd
|
Contact: |
Ms. julia zhou |
Address: |
174 WEST ZHAOSHANG ROAD,LEIZHUANG,LUANXIAN COUNTY,TANGSHAN,HEBEI,P.R.CHINA |
Postcode: |
101100 |
Tel: |
86 10 60557306 |
Fax: |
86 10 80542473 |
E-mail: |
|
|
|
|